Our Projects

We conduct project to make our services more reliable to our clients and also making the access of water to all parts of the Coast Region.

Our gok Projects

Extension of Ngomeni-Kichwa Cha Kati Water Supply in Gongoni Ward, Kilifi County – CONTRACT NO. CWWDA/T/KLF/W/01/2022-2023 GOK Projects Works

Contract NameContract ScopeStatus

Extension of Ngomeni-Kichwa Cha Kati Water Supply in Gongoni Ward, Kilifi County –

CONTRACT NO. CWWDA/T/KLF/W/01/2022-2023

1.Preliminary and General Items
-Contractual requirements and performance requirements.

2.Pipelines
-Laying of gravity mains 110mm HDPE Pn 10, -3700m and associated fittings.
-Installation of air release valves -10nr and washouts -10nr with associated fittings.
-Bulk meters doubled flanged -1nr and associated fittings.
-Chambers for air valves and washouts 26nr.
-Distribution lines 63mm hdpe 500m

3.Reinforced concrete tower 6m high -2nr
-Construct concrete towers 2nr.
-Install 2No. .x10,000l plastic tanks on 2nr concrete towers.
-Standard communal water points -6nr.
4.Ground water sump 50m3
-Water sump 50m3.
-Public washroom 1nr.

75%

Supply of water to Malindi fish landing site in Malindi constituency, Kilifi county- Contract No. CWWDA/RT/KLF/W/04/2022-2023 GOK Projects Works

Contract NameContract ScopeStatus

Supply of water to Malindi fish landing site in Malindi constituency, 

Kilifi county- Contract No. CWWDA/RT/KLF/W/04/2022-2023

1.Preliminary and General Items
-Contractual requirements and performance requirements.

2.Reinforced concrete tower 6m high -1nr 
-Construct concrete towers 1nr.
-Install 2No.x10,000l plastic tanks on 1nr concrete tower.

3.Pipelines   
-280m hdpe 63mm water pipe connection to storage tanks on rc tower at Malindi Fish Landing Site. 
-300m hdpe 63mm water pipe connection with pipe fittings and consumer meter at Jacaranda Fish Landing Site.
-Supply and install 10,000lts plastic tank on concrete platform.
-Communal water points 3nr.     

80%