Small Dams/Pans GOK Projects

Main Contract Names- Various
Contract Scope-13 pans
                            -13boreholes
                            -7km pipeline & 2 kiosks
Project Cost- Kshs. 171 million

Water for Schools GOK Projects

Main Contract Names                             Contract Scope                                      Status                          
Various-8 Boreholes
-100m3 Djabias
-Roof Rainwater Harvesting
-Water Tanks
Completed

Makamini Dam Phase 1 ( D&B) GOK Projects

Main Contract Names                           Contract Scope                                     Status                             
Makamini Dam Phase 1 ( D&B)-9m high dam, 740m length earth dam with spillway
-WTP capacity 2,815m3/d
-Rising Main 225 dia and 700m long
-Water Tanks 3,000m3
-Detailed Design studies completed
-65% physical progress/Elapsed time 127%
-Works stalled due to RAP

Dongo Kundu Project- Phase 2 GOK Projects

Main Contract Names                        Contract Scope                                                              Status       
-4.2Km of 700mm diameter pipeline
-Acquisition of Land for tank site
-Signed Contract Kshs. 226m-Physical progress is 40%
-Stalled
- New procurement

Extension of Ngomeni-Kichwa Cha Kati Water Supply in Gongoni Ward, Kilifi County CONTRACT NO. CWWDA/T/KLF/W/01/2022-2023 GOK Projects

Contract NameContract ScopeStatus

Extension of Ngomeni-Kichwa Cha Kati Water Supply in Gongoni Ward, Kilifi County –

CONTRACT NO. CWWDA/T/KLF/W/01/2022-2023

1.Preliminary and General Items
-Contractual requirements and performance requirements.

2.Pipelines
-Laying of gravity mains 110mm HDPE Pn 10, -3700m and associated fittings.
-Installation of air release valves -10nr and washouts -10nr with associated fittings.
-Bulk meters doubled flanged -1nr and associated fittings.
-Chambers for air valves and washouts 26nr.
-Distribution lines 63mm hdpe 500m

3.Reinforced concrete tower 6m high -2nr
-Construct concrete towers 2nr.
-Install 2No. .x10,000l plastic tanks on 2nr concrete towers.
-Standard communal water points -6nr.
4.Ground water sump 50m3
-Water sump 50m3.
-Public washroom 1nr.

100%

Supply of water to Malindi fish landing site in Malindi constituency, Kilifi county- Contract No. CWWDA/RT/KLF/W/04/2022-2023 GOK Projects

Contract NameContract ScopeStatus

Supply of water to Malindi fish landing site in Malindi constituency, 

Kilifi county- Contract No. CWWDA/RT/KLF/W/04/2022-2023

1.Preliminary and General Items
-Contractual requirements and performance requirements.

2.Reinforced concrete tower 6m high -1nr
-Construct concrete towers 1nr.
-Install 2No.x10,000l plastic tanks on 1nr concrete tower.

3.Pipelines   
-280m hdpe 63mm water pipe connection to storage tanks on rc tower at Malindi Fish Landing Site. 
-300m hdpe 63mm water pipe connection with pipe fittings and consumer meter at Jacaranda Fish Landing Site.
-Supply and install 10,000lts plastic tank on concrete platform.
-Communal water points 3nr.     

100%

Supply of water to Ngomeni fish landing site in Kilifi county -Contract no. CWWDA/T/KLF/W/018/2021-2022 GOK Projects

Contract NameContract ScopeStatus

Supply of water to Ngomeni fish landing site in Kilifi county.

Contract no. CWWDA/T/KLF/W/018/2021-2022

1.Preliminary and General Items
-Contractual Requirements and Performance requirements.
2.Pipelines
-12km Laying of Gravity mains 160mm HDPE Pn10 and associated fittings.
-Installation of air release valves  - 25nr and Washouts  - 27nr with associated  fittings.
-Bulk meters double flanged - 2nr and Zonal meters 5nr.
- Chambers for air valves and washouts 52nr.
- Distribution lines 90mm hdpe 1,000m.
- Distribution lines 63mm hdpe 2,000m.
- Micro-tunnelling pipes across highway.
3.Reinforced concrete tower 6m high  -1nr
- Construct Concrete towers 1nr.
- Install 2No.x10,000L plastic tanks on 1nr concrete tower
100%